DETERMINATION OF GROUND CONTROL POINT AROUND PMM

Abstract:

 Control point is a basic need and use as a reference datum in each measurement field. It is a key requirement for any new measures to enable the determination of the basis of the size and value planimetri coordinate set. Each cadastral measurements should be based on the satisfactory datum contained in the Circular of the Director General of Survey and Mapping, number 5 in 2009. (Cadastral Survey Regulations, 2009, 2009, PKPU bil5 / 2009).


---------------------------------------------

Keyword: Measure Ground Control Point, Civil Engineering Department
---------------------------------------------

IP no:
---------------------------------------------

Finding:

This measurement only focused on traverse and determined ground control point referred form the coordinates of CRM 1 and CRM 2.
Through the measurement that be proceed, students who are study the land survey program in Politeknik Merlimau Melaka can do the practical field work and follow the standard.
Student also can do the practical work in real situation even in small scale work

Name of student & registration no:

1.   Muhammad Imran bin sapari  14dut13f2032
2.   Nur ain Khadijah binti nurul azam  14dut13f2003
3.   Nur zarith farahin binti mohd sazli  14dut13f2034
4.   Nur eizliana binti norazli  14dut13f2001

Submitted By:
Md Nor Sirat (webmaster)
Submitted On:
10 Oct 2017
Filesize:
36.84 Kb
Downloads:
28
File Version:
JKA
File Author:
Muhammad Imran bin sapari Nur ain Khadijah binti nurul azam Nur zarith farahin binti mohd sazli Nur
File HomePage:
Click to view
Submitted On:
28 Sep 2017
Rating:
Total Votes:0
Be the first to comment! Please sign in or register.