Selamat Datang Ke Pusat Data Rasmi Politeknik Merlimau Melaka

Font Size

SCREEN

Profile

Tetapan
 
 
 
 
 
 
 
 
You have downloaded this file 0 times in the last 24 hours, limit is 5.
Your file downloads total 0 in the last 24 hours, limit is 5.

The Vertical Levelling
Download

Thank you for downloading The Vertical Levelling

Please click on the File HomePage link below

Description:

THE VERTICAL LEVELLING

Abstract:

Civil engineering is a field related to the construction environment, design and Maintenance, physical and built environment, including works such as bridges, roads, canals, dams and landfills. The existence of civil engineering is because of all the construction involves a lot of engineering work. In addition, a technology and construction, especially in the field of civil engineering techniques developed by the products used in the building site. 'The Vertical Levelling' is meant a product designed to help students build a wall angle of 90 ° with greater ease. This process consists of the following mixture, bricks and `vertical leveling tool '. Problems often experienced by students is that students are often a waste of time to adjust the angle at which goes a lot of tools. With this product, it can help speed up the time and cost of energy

Keyword: levelling, construction, angle

IP no:

Finding:

Accuracy from observer

5 student to be our respondent to test and observe product. then use spirit level to get the accuracy of the vertical angle. This data show the numbers of student that get accuracy and did not get the accuracy of the product.


From the pie chart we can see the percent accuracy from observe who are using our vertical levelling tools get 100% accurate for the vertical angle


While, the pie chart of student that not using our ‘vertical levelling’ is 80% did not get the accuracy of vertical angle just 20% of the student gets the exact vertical angle without using our product.

Suggestion for future work

i. Raise again this tool

ii. Thread must be kept in order to look neat

iii. Enlarge the scope of the product to the construction

iv. Existing tools , the holes indicate the level of a brick, add hole to mark the level of the mortar

v. Fill the existing vacant space with pencils,nails and thread.


Name of student & registration no:

1. Nuraina Sahira Binti Abdul Razak 14DKA14F2050

2. Muhammad Zuhair Bin Mohd Rafi 14DKA14F2054

3. Mohamad Fahmi Bin Marzuki 14DKA14F2012

4. Nur Muhammad Farhan Bin Hamzah 14DKA14F2056

Supervisor of the project:

1. Encik Mubin Bin Minhaj

2. Encik Mohd Izwan Bin Md Pojan

Submitted By:
Md Nor Sirat (webmaster)
Submitted On:
28 Sep 2017
Filesize:
42.23 Kb
Downloads:
31
File Author:
Encik Mubin Bin Minhaj,Encik Mohd Izwan Bin Md Pojan
File HomePage:
Click to view
Submitted On:
28 Sep 2017
Rating:
Total Votes:0
Be the first to comment! Please sign in or register.